User Tools

Site Tools


lostplot:manual:project_update

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lostplot:manual:project_update [2021/11/12 20:42]
admin
lostplot:manual:project_update [2021/11/13 16:14] (current)
admin
Line 1: Line 1:
 ====== Updating Projects ====== ====== Updating Projects ======
  
-In order to update an existing project in the database, select the [Update] toolbar button.+{{:​lostplot:​manual:​toolbar_0004.jpg?​nolink&​50 |}}In order to update an existing project in the database, select the [Update] toolbar button.
  
 If the project has not been previously saved, you will be prompted for a project name before saving. If the project has not been previously saved, you will be prompted for a project name before saving.
Line 9: Line 9:
 ==== Auto Save ==== ==== Auto Save ====
  
-Any change to a project configuration setting (such as split screen, document mode etc.) is updated in the project database record immediately. In regards to authored content however, there are two levels of auto-save available:+{{ :​lostplot:​manual:​toolbar_0006.jpg?​nolink&​100|}}Any change to a project configuration setting (such as split screen, document mode etc.) is updated in the project database record immediately. In regards to authored content however, there are two levels of auto-save available:
  
   - Auto-save cards   - Auto-save cards
Line 28: Line 28:
  
 {{:​logo.png?​nolink |}}\\ {{:​logo.png?​nolink |}}\\
-[[:​start|Pergamon Wiki Home]]+[[:​start|Pergamon Wiki Home]]\\ 
 +[[LostPlot:​home|LostPlot Home]]\\ 
  
lostplot/manual/project_update.1636749769.txt.gz · Last modified: 2021/11/12 20:42 by admin